Factors that influence flashing size shape and endlap requirements include roof pitch roof geometry slope length and climatic factors such as heavy snowfall or rainfall.
Valley detail metal roof.
Valleys are a very important part of a well designed roofing system.
Eave detail w gutter 1.
Sign up now to get the latest metal roofing and metal architectural product news 6 times a year.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
How to cut metal roofing to fit valleys.
With a clean valley you can lay down some peel and stick roofing membrane.
Metal valley trim also known as metal valley flashing is beneficial because it drains water away from the structure of your metal building which helps prevent moisture damage.
Pipe penetration w iso details.
When installing metal valley flashing there are a few things to keep in mind from cutting metal roofing to sealing the flashing.
Trussed valley set detail no sheathing continuous 2x4 sp no 2 attached to the roof 146 basic 160 ultimate mph wind speed.
Valley detail one piece vented ridge detail.
Some roof conditions such as valleys may require a longer endlap and or a larger flashing to properly drain moisture from the roof.
Fold the top over the roof ridge and cut the bottom along the drip edge metal.
How to secure metal roof valley by clips cleats or edge trapping roofing nails the installer fabricates simple clips or valley flashing cleats whose bent edge interlocks with the folded over or hemmed edges of the metal roof valley flashing to secure the valley to the roof deck.
We respect your privacy and will not use your email address for other.
Fabricated with hems but can also be fabricated without them in which case they could still be used for metal roofing or any other type of roofing.
Install synthetic roofing underlayment or felt paper according to manufacturer specifications and then install the first piece of valley flashing.
Use roof valley cleats at intervals of 24 o c.